Ledcor began work on the Cabin Gas Plant Phase 1 in August 2010. The Cabin Gas Plant, located 60 km (37 miles) northeast of Fort Nelson, British Columbia in the Horn River Basin area, is considered the largest shale gas field in Canada at a capacity of 800 million cubic feet per day.
Ledcor's scope of work included:
Site earthworks
Off-site pipe fabrication
Off-site assembly of 65 piperack modules
Structural steel erection
Concrete
Heavy lifts
Electrical
Instrumentation
Pre-engineered building installation
Based on Ledcor’s excellent performance on Phase 1, EnCana awarded Phase 2 to Ledcor and expanded Ledcor’s scope of work to also include:
Construction of the Encana Cabin Gas Plant 2 commenced August 2011 and was put on hold in December 2012 due to the market conditions for natural gas.